Fitzalan Road
Sheffield
Waterside Mews Development
Manchester
KEY FEATURES
55 Luxury Apartments on Site Construction
Strip Foundations & Reinforcements
Blockwork and Brickwork
External Car Park Areas
Soft & Hard Landscaping
Supply & Install
Temp Accomodation Units Provided
Fitzalan Road – Sheffield
This Project was awarded by Colin Gorman of Cullion Developments we were sub contracted to carry out a site clearance, hoarding and groundworks for the foundation of the 55 apartments based in She eld, Fitzalan Road. After completing our works in 11 weeks we were then asked to carry on and complete additional works due to the work ethic and manner we conducted our works.
CLIENT
VALUE
The Bund
Alchemist Cocktail Bar
After a successful first project with ECE ltd on the foundations of a new housing development, we were awarded another FRC project as
CLIENT
ECE Civils Ltd
VALUE
£13,000
KEY FEATURES
High Standard Seen Retaining Walls F4
Working In Conjunction with Other Trades
Working Close to Water
Tight Works Programme
Public Interface
KEY FEATURES
Restricted Access
Doka Propping System
C32 / 45 Concrete Mix
Circular F1 Finish Columns
Waterside Mews
Apartment Development
This Project was a joint project between ourselves and Dsuza Group in which we would construct a concrete deck that will be the foundation of the new stylish modern apartments being built just 20 minutes from Manchester city centre, this project was completed within 2 weeks to a very high standard, the client was very impressed and gave us the contractor of choice award for future projects.
CLIENT
Waterside Mews
VALUE
£42,000
Newark Infrastructure
Scheme RC Slab Works
This project was awarded by Buckingham group for the construction of reinforced concrete slabs for both the IDB and pumping station this project was to be completed in a timely manner of two weeks.
This area has planning permission for up to 3,150 houses, including low-cost housing, two retail and commercial centres, a 60-bed care home, two primary schools, community buildings, a medical centre, 50 hectares of mixed-use commercial development and landscaped green community spaces.
CLIENT
Buckingham Group Contracting
VALUE
£6,000
KEY FEATURES
A393 Mesh
Dowel Bar Joints
Formwork
High Quality Brush Finish
Trowled Edge
KEY FEATURES
Cleaning & Surface Preparation Works
Light Scabbling
Jet Washing
Reinforcement
Formwork F4 Finish – Angle Fillet
Trowel Finish
Newark Infrastructure
Additional Works
RC Steps – RC Culvert
This small project was for the extension of an existing RC concrete culvert it required a high spec finish and was completed within 2 days.
CLIENT
Buckingham Group Contracting
VALUE
£6,000
Lancaster Plots
This project was for the foundation of a new housing development that will a string of new houses be built as part of
CLIENT
ECE LTD
VALUE
£25,000
KEY FEATURES
Pecafil Formwork
Working alongside other trades
Restricted Access
C32/40 Concrete Mix
Reinforcement

OnForm Construction Ltd
51 Stockport Road
Denton
M34 6NB
0161 509 54 50
accounts@onformconstruction.com

On Form Construction LTD is a registered company in the United Kingdom | Company Number: 10456916
Privacy Policy | Terms and Conditions
Powered by Wordpress |© On Form Construction Ltd | Designed by: Refresh-Websites