PROJECTS

On Form Construction work with clients nationwide on contracts across a broad spectrum. Take a look at some of our most recent projects. 

For more information about any specific project that On Form Construction have provided services for, please “Contact Us”

KEY FEATURES

5

55 Luxury Apartments on Site Construction

5

Strip Foundations & Reinforcements

5

Blockwork and Brickwork

5

External Car Park Areas

5

Soft & Hard Landscaping

5

Supply & Install

5

Temp Accomodation Units Provided

  Fitzalan Road – Sheffield

This Project was awarded by Colin Gorman of Cullion Developments we were sub contracted to carry out a site clearance, hoarding and groundworks for the foundation of the 55 apartments based in She eld, Fitzalan Road. After completing our works in 11 weeks we were then asked to carry on and complete additional works due to the work ethic and manner we conducted our works.

CLIENT

Cullion Developments

VALUE

£255,000

  The Bund
  Alchemist Cocktail Bar

After a successful first project with ECE ltd on the foundations of a new housing development, we were awarded another FRC project as reward for our services, this contract was for the construction of the new contemporary Alchemist Cocktail Bar in the heart of Media City that would be seen to be open in Summer 2017.

CLIENT

ECE Civils Ltd

VALUE

£13,000

KEY FEATURES

5

High Standard Seen Retaining Walls F4

5

Working In Conjunction with Other Trades

5

Working Close to Water

5

Tight Works Programme

5

Public Interface

KEY FEATURES

5

Restricted Access

5

Doka Propping System

5

C32 / 45 Concrete Mix

5

Powerfloat Finish

5

Circular F1 Finish Columns

  Waterside Mews
  Apartment Development

This Project was a joint project between ourselves and Dsuza Group in which we would construct a concrete deck that will be the foundation of the new stylish modern apartments being built just 20 minutes from Manchester city centre, this project was completed within 2 weeks to a very high standard, the client was very impressed and gave us the contractor of choice award for future projects.

CLIENT

Waterside Mews

VALUE

£42,000

  Newark Infrastructure
  Scheme RC Slab Works

This project was awarded by Buckingham group for the construction of reinforced concrete slabs for both the IDB and pumping station this project was to be completed in a timely manner of two weeks.

​This area has planning permission for up to 3,150 houses, including low-cost housing, two retail and commercial centres, a 60-bed care home, two primary schools, community buildings, a medical centre, 50 hectares of mixed-use commercial development and landscaped green community spaces.

CLIENT

Buckingham Group Contracting

VALUE

£6,000

KEY FEATURES

5

A393 Mesh

5

Dowel Bar Joints

5

Formwork

5

High Quality Brush Finish

5

Trowled Edge

KEY FEATURES

5

Cleaning & Surface Preparation Works

5

Light Scabbling

5

Jet Washing

5

Reinforcement

5

Formwork F4 Finish – Angle Fillet

5

Trowel Finish

  Newark Infrastructure
  Additional Works
  RC Steps – RC Culvert 

This small project was for the extension of an existing RC concrete culvert it required a high spec finish and was completed within 2 days.

CLIENT

Buckingham Group Contracting

VALUE

£6,000

  Lancaster Plots

This project was for the foundation of a new housing development that will a string of new houses be built as part of project to regenerate the Lancaster Area.

CLIENT

ECE LTD

VALUE

£25,000

KEY FEATURES

5

Pecafil Formwork

5

Working alongside other trades

5

Restricted Access

5

C32/40 Concrete Mix

5

Reinforcement

OnForm Construction Ltd

51 Stockport Road
Denton
M34 6NB

0161 509 54 50

accounts@onformconstruction.com